Using The Spiash Guard And Drip Tray.37 - Kodak X-OMAT M6B Installation Instructions Manual

Hide thumbs Also See for X-OMAT M6B:
Table of Contents

Advertisement

Using the Splash Guard and Drip Tray
[1]
Install a SPLASH GUARD before removing or installing a RACK ASSEMBLY.
[2]
Set the RACK ASSEMBLY into the DRIP TRAY.
Filling the Tanks
NOTE
• Before filling the tanks with chemicals, it is recommended that you fill the tanks with water and
check the plumbing system for leakage with the processor energized.
• All adjustable metal band clamps used on tubing connections
must
be checked for tightness at the
time of the processor installation.
• Although a clamp may be properly tightened at the time of installation, cold-flow (shrinkage) of the
plastic tubing will take place beneath the clamp, thus the clamp may require further tightening within 2
to 4 weeks.
• Always check the tightness of the clamp after installing replacement tubing.
[1]
Remove all the RACKS.
[2]
Install the SPLASH GUARD. See Figure 37.
246626
37

Advertisement

Table of Contents
loading

Table of Contents