Leveling the Processor
To prevent damaging the LEVELING SCREWS and the processor, do not allow more than a
25 mm (1 in.) clearance between the bottom of the processor and the HEAD of the LEVELING
SCREW.
[1]
Install and seat the DEVELOPER, FIXER, and WASH RACK ASSEMBLIES.
Figure 22 Installing the Rack Assemblies
[2]
Check that the RACKS are in their correct positions and that the GEARS of the RACK ASSEMBLIES
engage with the GEARS of the MAIN DRIVE SHAFT.