Check And Storage; Check Before Receiving; Deliverables - Goodwe ET Series User Manual

Hide thumbs Also See for ET Series:
Table of Contents

Advertisement

User Manual V1.0-2022-08-30

4 Check and Storage

4.1 Check Before Receiving

Check the following items before receiving the product.
1. Check the outer packing box for damage, such as holes, cracks, deformation, and other
signs of equipment damage. Do not unpack the package and contact the supplier as soon as
possible if any damage is found.
2. Check the inverter model. If the inverter model is not what you requested, do not unpack the
product and contact the supplier.
3. Check the deliverables for correct model, complete contents, and intact appearance. Contact
the supplier as soon as possible if any damage is found.

4.2 Deliverables

Connect the DC cables with the included terminals. The manufacturer shall not be liable for
the damage if other terminals are used.
The number of pin terminals, PV connectors, and battery connectors are various depending
on different inverters. The actual accessories may differ.
PV connector: GW15K/20K-ET: 4 x PV+/PV-; GW25K/29.9K/30K-ET: 6 x PV+/PV-.
Battery connector: GW15K/20K-ET: 1 x BAT+/BAT-; GW25K/29.9K/30K-ET: 2 x BAT+/BAT-.
WARNING
NOTICE
21
04 Check and Storage

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gw15k-etGw20k-etGw25k-etGw29.9k-etGw30k-et

Table of Contents