Check And Storage; Check Before Receiving; Deliverables - Goodwe MS Series User Manual

Grid-tied pv inverter
Hide thumbs Also See for MS Series:
Table of Contents

Advertisement

04 Check and Storage

4 Check and Storage

4.1 Check Before Receiving

Check the following items before receiving the product.
1. Check the outer packing box for damage, such as holes, cracks, deformation, and other
signs of equipment damage. Do not unpack the package and contact the supplier as soon as
possible if any damage is found.
2. Check the inverter model. If the inverter model is not what you requested, do not unpack the
product and contact the supplier.
3. Check the deliverables for correct model, complete contents, and intact appearance. Contact
the supplier as soon as possible if any damage is found.

4.2 Deliverables

Connect the DC cables with the delivered terminals. The manufacturer shall not be liable for
the damage if other terminals are used.
• Communication module types: WiFi, LAN, Bluetooth, 4G, etc. The actual module delivered
depends on the communication method of the selected inverter.
• USB-RS485 cable is only for Brazil.
Inverter x 1
or
AC connector x 1
Communication
Module x N
WARNING
Mounting plate x 1
Communication
Connector x 1
Documentation x 1
NOTICE
Expansion bolt x 3
OT terminal x 1
Bluetooth Module x N USB-RS485 cable x N
10
User Manual V1.0-2022-10-30
or
PV connector x 1
Screw x 1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents