6F2S1914 (0.49)
for the scheme swathes [CH*_T.SFT]
•
Note that On should be set for the scheme switches [CH*_B.SYN] when the IED
connects to the MUX. On the other hand, the user should set OFF for the scheme
switches when the IED is linked with the MUX absent. The setting is available
for the ITU-T G703-1.2.1, 1.2.3 and optical interface (short distance: 2km class).
In the case of optical interface 30km and 80km class, this setting is neglected.
GRL200 (Soft 033 & 037)
- 505 -