Welding Start Sequence For Cmt Twin; Twin Operating Mode - Fronius TWIN Push Operating Instructions Manual

Hide thumbs Also See for TWIN Push:
Table of Contents

Advertisement

Welding start se-
quence for CMT
TWIN
L = Lead wire electrode, T = Trail wire electrode
1.
2.
3.
4.
A CMT TWIN welding process requires a WF 60i TWIN Drive unit and a wire buf-
fer.
In conjunction with a WF 60i TWIN Drive unit, all TWIN characteristics ignite ac-
cording to the above sequence.
TWIN operating
The robot controls use the signals "Operating mode TWIN System Bit 0" and
mode
"Operating mode TWIN System Bit 1" to define
-
-
54
1.
T
L
Both wire electrodes move towards the workpiece
Both wire electrodes make contact with the workpiece
The lead wire electrode starts the welding process, the trail wire electrode
moves away from the workpiece and waits for the start signal of the lead wire
electrode = welding start delay
As soon as the trail wire electrode receives the start signal, it also starts the
welding process
the lead and trail process line in TWIN mode
the active process line in single wire mode
2.
T
L
L
3.
4.
T
L
T

Advertisement

Table of Contents
loading

This manual is also suitable for:

Twin push/pullTwin cmt

Table of Contents