To add water to the water circuit
To open the stop valves of the water circuit
To open the air purge valves of the water circuit
Service manual
270
draft – 31/05/2022 15:53
3 Open the drain valve to drain water from the water circuit. Collect the drained
water in a drain pan, bottle,....
A
a
a
A Unit with built‑in backup heater
B Unit without backup heater
a Drain valve
4 To add water to the water circuit, see
Is the problem solved?
Yes
No
Prerequisite: Stop the unit operation via the user interface.
Prerequisite: Turn OFF the respective circuit breaker.
Prerequisite: Remove the required plate work, see
1 To fill the water circuit, use a field supply filling kit. Make sure you comply with
the applicable legislation.
2 Purge the water circuit, see
Is the problem solved?
Yes
No
1 The stop valves are located outside the unit. Open the valves by placing them
in line with the piping.
Is the problem solved?
Yes
No
Prerequisite: Stop the unit operation via the user interface.
B
a
"5.3.2 Repair
procedures" [
Action
No further actions required.
Return to the troubleshooting of the
specific error and continue with the
next procedure.
"4.16 Plate
"5.3.2 Repair
procedures" [
Action
No further actions required.
Return to the troubleshooting of the
specific error and continue with the
next procedure.
Action
No further actions required.
Return to the troubleshooting of the
specific error and continue with the
next procedure.