Optical Plummet - Sokkia SET2CII Operator's Manual

Intelligent total station
Table of Contents

Advertisement

23. CHECKS AND ADJUSTMENTS
23.5
Optical plummet
(Check)
Adjust levelling
3)
foot
screws
1) Level the
SET2C
and exactly cen-
tre a surveying point in the reticle
of the optical plummet.
2) Turn the upper part 180"
If the surveying point is still
centred, no adjustment is neces-
sary.
If the surveying point is off-
centre, adjust as follows:
adjust~ng screws
6 % )
Correct halfthe deviation with the
levelling foot screws
@.
Unscrew the optical plummet fo-
cussing ring
@.
'Adjust the remaining half of the
displacement with the 4 adjusting
screws to centre the reticle exactly
on the surveying point.
When surveying point is seen as a
green (gray) area:
O
Loosen the
upper
(lower)
screw slightly.
@
Tighten the lower (upper)
screw by the same amount.

Advertisement

Table of Contents
loading

Table of Contents