Download Print this page
Huawei UPS5000-H-1200 kVA Quick Manual
Huawei UPS5000-H-1200 kVA Quick Manual

Huawei UPS5000-H-1200 kVA Quick Manual

Hide thumbs Also See for UPS5000-H-1200 kVA:

Advertisement

Quick Links

UPS5000-H-1200 kVA
(Three-Phase Three-Wire)
Quick Guide
Before installing the equipment, read the product documentation carefully to get
familiar with product information and safety precautions. Huawei shall not be liable
for any consequence caused by violation of the storage, transportation, installation,
and operation regulations specified in this document. Log in to the technical support
website to view the product documentation and safety precautions.
The information in this document is subject to change without notice. Every effort
has been made in the preparation of this document to ensure accuracy of the
contents, but all statements, information, and recommendations in this document do
not constitute a warranty of any kind, express or implied.
Only qualified personnel are allowed to perform operations on the equipment.
Operation personnel should understand the system, its working principles, and
relevant national/regional standards.
Wear dedicated personal protective equipment during operations. Use dedicated
insulated tools during electrical operations.
Preparations for Installation
Environment and Space Requirements
2650 kg
Relative humidity
Operating
Floor and support
Airtight equipment
0%–95% RH
temperature
load capacity
room
(non-condensing)
0°C–55°C
Heat source,
Water source,
inflammable or
Direct sunlight
conductive metal dust
water vapor
explosive article
Unit: mm
Issue: 03
Date: 2024-05-20
Recommended Circuit Breaker Specifications when the Short-Circuit
Current Going Through the Device Is less than 65 kA in a 380 V AC/400
Capacity
1200 kVA
1100 kVA
1000 kVA
900 kVA
800 kVA
700 kVA
600 kVA
Excessive salt
content
500 kVA
400 kVA
300 kVA
Dust,
Volatile or
corrosive substance
200 kVA
Dimensions
Power
Bypass
Inductor
cabinet
cabinet
cabinet
V AC/415 V AC Voltage System
Bypass
Maintenance Bypass
Mains Input
Output
Input
(Single UPS)
2500 A/3P
2000 A/3P
2000 A/3P
2000 A/3P
2500 A/3P
2000 A/3P
2000 A/3P
2000 A/3P
2000 A/3P
1600 A/3P
1600 A/3P
1600 A/3P
2000 A/3P
1600 A/3P
1600 A/3P
1600 A/3P
1600 A/3P
1250 A/3P
1250 A/3P
1250 A/3P
1600 A/3P
1250 A/3P
1250 A/3P
1250 A/3P
1250 A/3P
1000 A/3P
1000 A/3P
1000 A/3P
1000 A/3P
800 A/3P
800 A/3P
800 A/3P
800 A/3P
630 A/3P
630 A/3P
630 A/3P
630 A/3P
630 A/3P
630 A/3P
630 A/3P
400 A/3P
400 A/3P
400 A/3P
400 A/3P
1
2
Recommended Cable Specifications (mm
) in a 380 V AC/400 V AC/415 V
AC Voltage System
Capacity
Mains Input Bypass Input
Output
1200 kVA
L1: 6 x 240
L1: 6 x 240
U: 6 x 240
L2: 6 x 240
L2: 6 x 240
V: 6 x 240
L3: 6 x 240
L3: 6 x 240
W: 6 x 240
PE: 3 x 240
PE: 3 x 240
PE: 3 x 240
1100 kVA
1000 kVA
L1: 5 x 240
L1: 5 x 240
L1: 5 x 240
L2: 5 x 240
L2: 5 x 240
L2: 5 x 240
L3: 5 x 240
L3: 5 x 240
L3: 5 x 240
PE: 3 x 240
PE: 3 x 240
PE: 3 x 240
900 kVA
800 kVA
L1: 4 x 240
L1: 4 x 240
U: 4 x 240
L2: 4 x 240
L2: 4 x 240
V: 4 x 240
L3: 4 x 240
L3: 4 x 240
W: 4 x 240
PE: 2 x 240
PE: 2 x 240
PE: 2 x 240
700 kVA
L1: 4 x 185
L1: 4 x 185
U: 4 x 185
L2: 4 x 185
L2: 4 x 185
V: 4 x 185
600 kVA
L3: 4 x 185
L3: 4 x 185
W: 4 x 185
PE: 2 x 185
PE: 2 x 185
PE: 2 x 185
L1: 3 x 185
L1: 3 x 185
U: 3 x 185
L2: 3 x 185
L2: 3 x 185
V: 3 x 185
500 kVA
L3: 3 x 185
L3: 3 x 185
W: 3 x 185
PE: 2 x 150
PE: 2 x 150
PE: 2 x 150
L1: 2 x 240
L1: 2 x 240
U: 2 x 240
L2: 2 x 240
L2: 2 x 240
V: 2 x 240
400 kVA
L3: 2 x 240
L3: 2 x 240
W: 2 x 240
PE: 240
PE: 240
PE: 240
L1: 2 x 150
L1: 2 x 150
U: 2 x 150
L2: 2 x 150
L2: 2 x 150
V: 2 x 150
300 kVA
L3: 2 x 150
L3: 2 x 150
W: 2 x 150
PE: 150
PE: 150
PE: 150
L1: 2 x 95
L1: 2 x 95
U: 2 x 95
L2: 2 x 95
L2: 2 x 95
V: 2 x 95
200 kVA
L3: 2 x 95
L3: 2 x 95
W: 2 x 95
PE: 95
PE: 95
PE: 95
Equipotential
Battery Input
Ground
+: 6 x 240
-: 6 x 240
GND: 16
PE: 3 x 240
+: 6 x 240
-: 6 x 240
GND: 16
PE: 3 x 240
+: 4 x 240
-: 4 x 240
GND: 16
PE: 2 x 240
+: 3 x 240
-: 3 x 240
GND: 16
PE: 2 x 185
+: 3 x 185
-: 3 x 185
GND: 16
PE: 2 x 150
+: 2 x 240
-: 2 x 240
GND: 16
PE: 240
+: 2 x 185
-: 2 x 185
GND: 16
PE: 185
+: 2 x 120
-: 2 x 120
GND: 16
PE: 120

Advertisement

loading
Need help?

Need help?

Do you have a question about the UPS5000-H-1200 kVA and is the answer not in the manual?

Questions and answers

Summary of Contents for Huawei UPS5000-H-1200 kVA

  • Page 1 L1: 4 x 185 U: 4 x 185 V AC/415 V AC Voltage System +: 3 x 240 familiar with product information and safety precautions. Huawei shall not be liable L2: 4 x 185 L2: 4 x 185 V: 4 x 185...
  • Page 2 Installing Cabinets Move the cabinet to the installation position. Install anchor baffle plates around the cabinets. Determine the cabinet installation position on the floor based on the mounting holes in the marking-off template. There are sheet metal stiffeners at the bottom of the inductor cabinet. After the pallet is removed, the forklift truck cannot transport the inductor cabinet from the front.
  • Page 3 Install signal cables between the UPS and the inductor cabinet. Install equipotential ground cable for cabinets. Two power sources Power cable hole a. Remove the cover. Signal cable hole Install cables between the inductor cabinet and the UPS cabinet. b. Remove the copper bars. Install input and output power cables and lithium battery signal cables.
  • Page 4 Huawei Digital Power Technologies Co., Ltd. the right torque, and that no short-circuit occurs. BAT+ BAT+ DC power Huawei Digital Power Antuoshan Headquarters, Futian District, Shenzhen Battery or BBB box cable BAT- BAT- 518043...