UPS5000-H-800 kVA
(Three-Phase Three-Wire)
Quick Guide
•
Before installing the equipment, read the product documentation carefully to get familiar with
product information and safety precautions. Equipment damage caused by failure to abide by the
storage, transportation, installation, and operation guidelines specified in the product
documentation is not covered by the product warranty. You can log in to the technical support
website to view product documentation and safety precautions.
•
The information in this document is subject to change without notice. Every effort has been made
in the preparation of this document to ensure accuracy of the contents, but all statements,
information, and recommendations in this document do not constitute a warranty of any kind,
express or implied.
•
Only qualified personnel are allowed to perform operations on the equipment. Operation
personnel should understand the system, its working principles, and relevant national/regional
standards.
•
Wear dedicated personal protective equipment during operations. Use dedicated insulated tools
during electrical operations.
Preparing for the Installation
Environment and Clearance Requirements
1850 kg
Relative humidity
Operating
Floor and support
Airtight equipment
temperature range
0% to 95% RH
room
load capacity
0°C–55°C
(non-condensing)
Heat source,
Water source or
Dust or conductive
inflammable or
Direct sunlight
water vapor
metal dust
explosive article
Unit: mm
Recommended Circuit Breaker Specifications when the Short-Circuit
Current Going Through the Device Is less than 65 kA in a 380 V AC/400
Capacity
Issue: 03
Date: 2024-05-20
800 kVA
700 kVA
600 kVA
500 kVA
400 kVA
300 kVA
200 kVA
Recommended Cable Specifications (mm
Capacity
Mains Input
L1: 4 x 240
L2: 4 x 240
800 kVA
L3: 4 x 240
PE: 2 x 240
L1: 4 x 240
L2: 4 x 240
700 kVA
L3: 4 x 240
PE: 2 x 240
L1: 4 x 185
Excessive salt
content
L2: 4 x 185
600 kVA
L3: 4 x 185
PE: 2 x 185
L1: 3 x 185
L2: 3 x 185
500 kVA
L3: 3 x 185
PE: 2 x 150
L1: 2 x 240
Volatile or corrosive
L2: 2 x 240
substance
400 kVA
L3: 2 x 240
PE: 240
Dimensions
Power
Bypass
Inductor
cabinet
cabinet
cabinet
V AC/415 V AC Voltage System
Maintenance
Mains Input
Bypass Input
Output
Bypass
1600 A/3P
1250 A/3P
1250 A/3P
1250 A/3P
1600 A/3P
1250 A/3P
1250 A/3P
1250 A/3P
1250 A/3P
1000 A/3P
1000 A/3P
1000 A/3P
1000 A/3P
800 A/3P
800 A/3P
800 A/3P
800 A/3P
630 A/3P
630 A/3P
630 A/3P
630 A/3P
630 A/3P
630 A/3P
630 A/3P
400 A/3P
400 A/3P
400 A/3P
400 A/3P
2
) in a 380 V AC/400 V AC/415 V
AC Voltage System
Equipotential
Bypass Input
Output
Battery Input
L1: 4 x 240
U: 4 x 240
+: 4 x 240
L2: 4 x 240
V: 4 x 240
-: 4 x 240
L3: 4 x 240
W: 4 x 240
PE: 2 x 240
PE: 2 x 240
PE: 2 x 240
L1: 4 x 240
U: 4 x 240
+: 4 x 240
L2: 4 x 240
V: 4 x 240
-: 4 x 240
L3: 4 x 240
W: 4 x 240
PE: 2 x 240
PE: 2 x 240
PE: 2 x 240
L1: 4 x 185
U: 4 x 185
+: 3 x 240
L2: 4 x 185
V: 4 x 185
-: 3 x 240
L3: 4 x 185
W: 4 x 185
PE: 2 x 185
PE: 2 x 185
PE: 2 x 185
L1: 3 x 185
U: 3 x 185
+: 3 x 185
L2: 3 x 185
V: 3 x 185
-: 3 x 185
L3: 3 x 185
W: 3 x 185
PE: 2 x 150
PE: 2 x 150
PE: 2 x 150
L1: 2 x 240
U: 2 x 240
+: 2 x 240
L2: 2 x 240
V: 2 x 240
-: 2 x 240
L3: 2 x 240
W: 2 x 240
PE: 240
PE: 240
PE: 240
1
Recommended Cable Specifications (mm
AC Voltage System
Capacity
Mains Input
Bypass Input
L1: 2 x 150
L1: 2 x 150
L2: 2 x 150
L2: 2 x 150
300 kVA
L3: 2 x 150
L3: 2 x 150
PE: 150
PE: 150
L1: 2x95
L1: 2x95
L2: 2x95
L2: 2x95
200 kVA
L3: 2x95
L3: 2x95
PE: 95
Installing the Cabinets
1
Determine the cabinet installation position on the floor based on the mounting holes
in the marking-off template.
Power
cabinet
A: mounting holes on the channel steel
B: mounting holes on the floor
C: front door direction of the cabinet
2
Install expansion sleeves for expansion bolts.
M12x60 bolt
Spring washer
Flat washer
Expansion Sleeve
Expansion nut
Ground
GND: 16
3
Remove the right side panel from the UPS and install it on the side of the inductor
cabinet.
GND: 16
GND: 16
GND: 16
GND: 16
2
) in a 380 V AC/400 V AC/415 V
Equipotential
Output
Battery Input
Ground
U: 2 x 150
+: 2 x 185
V: 2 x 150
-: 2 x 185
GND: 16
W: 2 x 150
PE: 185
PE: 150
U: 2x95
+: 2x120
V: 2x95
-: 2x120
GND: 16
W: 2x95
PE: 120
PE: 95
PE: 95
Bypass
Inductor
cabinet
cabinet
Unit: mm
Cement floor
Need help?
Do you have a question about the UPS5000-H-800 kVA and is the answer not in the manual?
Questions and answers