Step 2 Drill mounting holes on the channel steel using a hammer drill.
Step 3 You are advised to use an electric forklift to move the cabinet to the mounting
holes on the channel steel.
Step 4 (Optional) If the nuts cannot be placed on the side of the channel steel, drill holes
near the mounting holes on the side of the channel steel to place the nuts for
securing the cabinet.
Figure 4-21 Hole positions on the channel steel
(1) Channel steel
Step 5 Secure the cabinet to the channel steel.
Step 6 Install anchor baffle plates around the cabinet.
----End

4.7 Installing Inductor Cabinet PSUs

Context
Procedure
Step 1 Install inductor cabinet PSUs.
1.
2.
3.
4.
Issue 02 (2023-11-07)
NO TE
● In this example, one cabinet is installed not against a wall on C-channel steel with the
openings facing downwards.
● The channel steel model, installation mode, whether holes need to be drilled on a side,
hole size, and the number of cabinets are subject to the site survey data.
If the three-phase three-wire model is used, inductor cabinet PSUs and baffle
plates need to be installed in the inductor cabinet onsite.
Inductor cabinet PSUs are delivered separately, and baffle plates are placed in
the fitting bag of the inductor cabinet.
Push the locking latch downwards.
Pull out the handle.
Insert the PSU into the slot and push it along the guide rails until it is in
position.
Push the handle in place and lock it.
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 Installation and Cable Connection
(2) Hole positions on the channel steel
87

Advertisement

Table of Contents
loading

Table of Contents