3.7.8 Reboot

Once the basic configuration settings are saved, reboot the eNB. There are two options for rebooting in
the eNB GUI. From the landing page of the eNB GUI, navigate to System > Reboot, or select Reboot under
the Welcome banner (Figure 3-24 ).

Figure 3-24: Reboot

3.7.9 Verify eNB Operational Status

When the eNB is finished rebooting, check the eNB status using the eNB GUI and the OMC. Once the eNB
is mounted at its intended destination and powered on, recheck the status settings.
eNB GUI: Go to Basic Setting > Basic Info and check the Cell Status field. It should show Active.
Also, check that GPS Sync Status is reported as Synchronized (Figure 3-25).
OMC: Go to Monitor > eNB to see if the Cell Status shows Active and the Sync Status shows GPS
Synchronized (Figure 3-26).
NOTE: To manage which columns of information are displayed on the Monitor > eNB page, select
the Settings icon
columns display. Select a category, then drag and drop it in the preferred order (Figure 3-27).
in the upper left of the window. You can customize the order in which the