Nova230i Outdoor 2x500 mW eNodeB Installation Guide
3.7.7 Reboot
Once the basic configuration settings are saved, reboot the eNB. There are two options for
rebooting in the eNB GUI. From the landing page of the eNB GUI, navigate to System > Reboot, or
select Reboot under the Welcome banner (Figure 3-22).
Figure 3-22: Reboot
3.7.8 Verify eNB Operational Status
When the eNB is finished rebooting, check the eNB status using the eNB GUI and the OMC. Once
the eNB is mounted at its intended destination and powered on, recheck the status settings.
eNB GUI: Go to Basic Setting > Basic Info and check the Cell Status field (Figure 3-23). It should
show Active. Also, check that GPS Sync is reported as GPS Sync Status.
OMC: Go to eNB > Monitor to see if the Cell Status shows Active and the Sync Status shows
•
GPS Synchronized (Figure 3-24).
NOTE: Ensure you have selected ALL in the display settings window in the
OMC > eNB > Monitor page to view Cell Status ( Figure 3-24) and Sync Status
(Figure 3-25).
34