Start-Up Of The Machine; Transport Position To Workposition; Transport - HE-VA Disc-Roller XL Contour Operating Instructions/Spare Parts List

Table of Contents

Advertisement

UK
General Information
The machine is supplied as standard in transport position. At start-up, attach the machine to the
tractor.
Important:
The hoses for the drawbar - / wheel cylinder are provided with red cable straps.
The hoses for the folding cylinder are provided with blue cable straps.
The hoses for the disc cylinder are provided with green cable straps.
Attachment
1. Reverse the tractor to the machine.
2. Connect all hydraulic hoses to the tractor outlets.
3. Pressurise the drawbar - and the wheel cylinder (red) so that the machine
drawbar is lifted to the suitable height.
4. Then reverse the tractor and attach the machine.
5. Now lift the machine to maximum height.

Transport position to workposition

1. Important: When unfolding the side sections, the locking claw must first be
relieved by activating the folding function, until the side sections meet the
stop at the center frame. Next, when the unfolding function is activated, the
locking claw then first will open, after which the side sections are unfolding.
2. When the side sections are completely unfolded, let go of the hydraulic handle
and the machine is ready for use.
Always set the tractor's flow control on MAX, to make sure that the side sections
will follow each other.
3. Unfold the edge equipment to working position.
4. Now lift and lower the discs to the required working depth.

Transport

1. Lift the discs to the top before folding up the machine.
2. Then lift the machine to maximum transport height.
3. Fold up the side sections (blue) towards the stop on the centre frame, and the
locking claw will engage. It is important to check visually that the locking
claw is engaged. The hydraulic system must then briefly be put in the float
position after the locking pawls are engaged, until the locking claw has relieved
the hydraulics.
4. Now the machine is secured and ready for transport.
5. Lower the machine in order to minimise the transport height, to get a point of
gravety as low as possible. Slow and gentle cornering is recommended as
otherwise the machine is at risk to tip over.
Disc-Roller XL Contour 4.5 – 5.5m

Start-up of the machine

Check that the towing hook height is between 500 og 600 mm.
Check that the factory-fitted male quick couplings fit into the tractor's
female quick couplings.