Delivery Check; Start-Up Of The Machine - HE-VA Triple-Tiller 4.0m Operating Instructions Manual

Hydraulic folding
Table of Contents

Advertisement

UK

Delivery check

Start-up of the machine

Check :
 the machine for any damages.
 for transport damage to the paint.
 hydraulic hoses for cuts and other damage. Check that none of the other hydraulics components
were damages during transport.
 that the frame has not been damaged.
 that the transport wheels are secure and in good condition.
 air pressure level according to technical specifications.
 that all wearing points are intact.
 that all distance clips for depth adjustment are included.
 that all light systems are in working order (if any such system is mounted).
Check the torque:
 wheel bolts: 386 Nm
 mounting plate for towing eye
6 pcs. bolts 541 Nm
Check machine functioning (tractor needed):
 raising – lowering – hydraulic unfolding
 spindle adjustable levelling discs / levelling tines
 spindle adjustable support wheels
 rollers / scrapers
Triple – Tiller 4,0 m – 5,0 m
6
22/05 2013

Advertisement

Table of Contents
loading

This manual is also suitable for:

Triple-tiller 5.0m

Table of Contents