General information.
The Euro-Tiller requires 2 double-acting oil outlets.
Attachment and uncoupling
From transport to working position:
1. Raise the machine to max. transport height.
2. Fold out the wing sections.
3. Adjust the working depth.
From working to transport position:
4. Raise the machine to max. transport height.
5. Fold in the wing sections.
After the first 10 hours of operation, retighten the machine. Check hydraulic hoses, fittings and
cylinders for leaks and retighten.
Further check on a regular basis that all bolts are tightened.
Before the winter storage, wash and lubricate the machine. If you use high-pressure cleaner, do
not spray directly on the ball bearings. After the washing, you may spray the machine with oil.
For permanent outdoor parking during winter harrow parked unfolder.
Lubrication
For lubrication, maintenance and repair, the Euro-Tiller must be lowered, the tractor must be braked and
the motor stopped.
Euro-Tiller
Start-up of the machine
Make sure that the wing sections are locked.
Maintenance
9
23-05-2016