Commissioning; Unpacking The Centrifuge; Remove The Transport Lock - Hettich MIKRO 220 Operating Instructions Manual

Rotors and accessories
Hide thumbs Also See for MIKRO 220:
Table of Contents

Advertisement

Commissioning

5
Commissioning
5.1

Unpacking the centrifuge

5.2

Remove the transport lock

18 / 40
CAUTION
Danger of crushing due to parts falling out of the transport
packaging.
Keep the device balanced during the unpacking
process.
Only open the packaging at the points provided for this
purpose.
CAUTION
Risk of injury from lifting heavy loads.
Provide an adequate number of helpers.
Note the weight. See ⮫ 
on page 9 .
NOTICE
Damage to the device due to improper lifting.
Do not lift the centrifuge by the control panel or the
control panel holder.
Personnel:
Trained user
1.
If present: Remove the packaging tapes.
2.
Lift the box up and remove the padding.
3.
Remove the accessories and store them safely.
4.
Place the device on a stable and level surface.
Personnel:
Trained user
The lid is closed.
Rev.: 04 / 11.2023
Chapter 3 'Device overview'
AB2200en_SA

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mikro 220 r

Table of Contents