Rotating The Control Box - REMEHA Gas 320 Ace Installation And User Manual

High-efficiency standing gas boiler
Hide thumbs Also See for Gas 320 Ace:
Table of Contents

Advertisement

Fig.36
Place the boiler
1
2
Fig.37
Open the casing
3
Fig.38
Level the boiler
4
5
5.2

Rotating the control box

7734324 - v.07 - 21092022
1. Manoeuvre the boiler to the exact location.
2. Unscrew the levelling feet until they stand firmly on the floor.
AD-3001416-02
3. Open the casing by lifting up the front panel and taking it off.
AD-3001417-02
4. Adjust the levelling feet to level the boiler.
5. Check if the boiler is resting solely on the levelling feet (transport
wheels must be off the floor).
AD-3001418-02
If the installation location obstructs the display, the control box can be
rotated. Proceed as follows: