5 Installation
5
Installation
5.1
Installation regulations
5.2
Unpack and fit the control box
Fig.9
Fig.10
4
18
MID _HMI T-control - Gas 120 ACE
1. Cut and remove the packaging.
1
MW-6000750-02
2. Remove the two screws from the boiler's rear top panel.
3. Lift the top panel.
4. Remove the top panel.
3
2
2
MW-6000760-01
Caution
The appliance must be installed and maintained by a certified
professional in accordance with prevailing statutory texts and
codes of practice.
Caution
Wear gloves when handling the control box.
Important
The technical documentation is housed in the protective block.
7717201 - v03 - 25062019