Fayat Group DYNAPAC SC2500WS Operating Instructions Manual page 393

Paver finisher
Table of Contents

Advertisement

9
Auger temperature measurement (O)
1
A sensor can be installed to detect the material temperature in the auger area.
- Fasten the sensor (1) above the basic auger width on the machine frame with the
related magnetic holder (2) as shown.
- Connect the connection cable (3) of the sensor to the centre socket (TEMP) of the
signal converter (4).
The signal converter (4) should be positioned above the centre hose guide of the
A
screed with the related magnetic holders.
- Install the connection cable (5) between the signal converter connection (CAN->)
and adapter cable (6).
- Connect the adapter cable (6) to the Y cable (7) and produce the connection to the
slope control sensor (8).
- Also connect the machine interface for the slope control sensor (9) to the Y cable.
2
4
8
3
7
4
5
6
9
E 13 61

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dynapac sd2500w897898

Table of Contents