Fayat Group DYNAPAC SC2500WS Operating Instructions Manual page 293

Paver finisher
Table of Contents

Advertisement

Before starting work
(in the morning or when starting paving)
- Heed the safety instructions.
- Check the personal protective equipment.
- Take an inspection walk around the paver finisher and check for leaks and damages.
- Install parts removed for transportation or for the night.
- When screed is operated with the optional gas heating system, open the closing
valves and the main shut-off valve.
- Perform the check according to the following "Checklist for the machine operator".
Check list for the machine operator
Check!
Emergency stop button
- on the operating panel
- on both remote controls
Steering
Horn
- on the operating panel
- on both remote controls
Lights
Screed hazard flasher
(with vario screeds)
Gas heater system (o):
- Bottle holders
- Bottle valves
- Pressure reducer
- Hose break safety devices
- Shut-off valves
- Main shut-off valve
- Connections
- Indicator lamps of the switch box
How?
Push in the button.
The diesel engine and all running drives
must stop immediately.
The paver finisher must immediately
follow every steering wheel movement
in a precise manner. Check straight
ahead travel.
Briefly press the horn button.
Horn signal must sound.
Switch on with the ignition key,
walk around the paver finisher
to check and switch off again.
With the ignition switched on,
press the switches for extending/
retracting the screed parts.
Hazard warning flashers must flash.
Check:
- Secure seat
- Cleanliness and tightness
- Working pressure 1.5 bar
- Function
- Function
- Function
- Tightness
- All indicator lamps must light up when
the system is switched on
D 43 3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dynapac sd2500w897898

Table of Contents