SmartACU2000D Smart Array Controller
User Manual (With PID Modules)
4.4 Installation Requirements
Figure 4-1 Installation requirements
4.5 Installing the Cabinet
4.5.1 Installing the Mounting Bracket
A mounting bracket has four groups of tapped holes, each group containing four
tapped holes. Mark any hole in each group based on site requirements and mark
four holes in total. Two round holes are preferred to secure the mounting bracket.
Issue 05 (2023-09-26)
Copyright © Huawei Technologies Co., Ltd.
4 System Installation
41