Download Print this page

Installing The Cabinet; Wall-Mounted Installation - Huawei SmartACU2000D Quick Manual

Smart array controller
Hide thumbs Also See for SmartACU2000D:

Advertisement

3

Installing the Cabinet

3.1
Preparations
Installation Dimensions
3.2
Installing the Mounting Bracket
The mounting bracket has four groups of tapped holes, each group containing four tapped
holes. Mark any hole in each group based on site requirements and mark four holes in total.
Two round holes are preferred.

Wall-mounted Installation

Avoid drilling holes in the water pipes and power cables buried in the wall.
To prevent dust inhalation or contact with
eyes, wear safety goggles and an anti-
dust mask when drilling holes.
Clean up any dust in and around the holes
using a vacuum cleaner and measure the
distance between holes. If the holes are
inaccurately positioned, drill holes again.
Level the head of the expansion sleeve
with the concrete wall after removing the
bolt, spring washer, and flat washer.
Otherwise, the mounting plate will not be
securely installed on the concrete wall.
Bolts
When the cabinet is installed on a wall,
you need to prepare M12x60 stainless
steel exploded expansion bolts.
When the cabinet is installed on a
support or a pole, use the M12x40 bolt
assemblies delivered with the cabinet.
1. Mark hole positions.
11

Advertisement

loading

This manual is also suitable for:

Smartacu2000d-d-01Smartacu2000d-d-03