Omron C200HE-CPU42-E Instruction Manual page 133

Table of Contents

Advertisement

Specifications
6. RUN output is only available when the Power Supply Unit is mounted on the CPU Backplane.
7. Maintain an ambient storage temperature of –20 to 30_C and relative humidity of 25% to 70% when
storing the product for longer than 3 months to keep the replacement notification function in optimum
working condition.
8. Change the applied voltage gradually using the adjuster on the Tester. If dielectric strength voltage is
suddenly applied or turned OFF using the switch on the Tester, the generated impulse voltage may dam-
age the Power Supply Unit.
9. The Power Supply Unit's internal parts may deteriorate or be damaged if the Unit is used outside the
power supply output capacity range for a long period of time or if the output is short-circuited.
CPU Unit Specifications
Control Method
Stored program
I/O Control
Cyclic scan and immediate processing are both possible.
Method
Programming
Ladder diagram
Method
Instruction Length
1 address/instruction, 1 to 4 words/instruction
Number of
C200HE-CPUjj-E:
Instructions
C200HE-CPUjj-ZE: 14 basic instructions + 286 special instructions
Execution Time
Basic instructions:
Special instructions: C200HE-CPUjj-E/ZE: 1.2 µs min.
Program Capacity
C200HE-CPU11-E/ZE:
C200HE-CPU32-E/42-E/ZE: 7.2K words max.
C200HG-CPUjj-E/ZE:
C200HX-CPUj4-E/ZE:
C200HX-CPUj5-ZE:
IR Area: I/O bits
640 bits (00000 through 02915, 30000 through 30915)
IR Area: Work bits
6,528 bits (03000 through 23515, 31000 through 51115)
SR bits
1,016 (23600 through 25507 and 25600 through 29915)
TR bits
8 (TR 0 through 7)
HR bits
1,600 (HR 0000 through 9915)
AR bits
448 (AR 0000 through 2715)
LR bits
1,024 (LR 0000 through 6315)
Timers/Counters
512 (TIM/CNT 000 through 511)
DM words
Read/write: 6,144 (DM 0000 through 6143)
Read only: 512 (DM 6144 through 6655)
Expansion DM
Read/write
C200HE-CPUjj-E/ZE:
C200HG-CPUjj-E/ZE: 6,144 words (EM 0000 to EM 6143)
C200HX-CPUjj-E/ZE:
C200HX-CPU65-ZE: 6,144 words × 8 banks (EM 0000 to EM 6143)
C200HX-CPU85-ZE: 6,144 words × 16 banks (EM 0000 to EM 6143)
Power Failure
Holds HR, AR, CNT, and DM, EM and clock (RTC) contents.
Backup Function
Memory Backup
The battery service life is five years at 25°C. The service life will be shortened if the battery is used
Time
at higher temperatures.
Replace the battery within one week after the battery alarm indicator starts blinking. When
replacing the battery, install the new battery within five minutes after removing the old one.
Self-diagnostic
CPU errors (watchdog timer), I/O verification errors, host link errors, memory errors, battery errors,
Function
I/O bus errors, remote I/O errors, etc.
Program Check
Carries out program checks at the beginning of operation for items such as no END instruction,
Function
instruction errors, and so on.
118
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
14 basic instructions + 231 special instructions
C200HE-CPUjj-E/ZE: 0.3 µs min.
C200HG-CPUjj-E/ZE: 0.15 µs min.
C200HX-CPUjj-E/ZE: 0.1 µs min.
C200HG-CPUjj-E/ZE: 0.6 µs min.
C200HX-CPUjj-E/ZE: 0.4 µs min.
3.2K words max.
15.2K words max.
31.2K words max.
36.2K words max.
3,000 words max. (DM 7000 through 9999)
None
6,144 words × 3 banks (EM 0000 to EM 6143)
Appendix B

Advertisement

Table of Contents
loading

Table of Contents