Pentair E-Box MAESTRO Lite Installation And Operation Manual page 55

Table of Contents

Advertisement

• Eco (default -30%): Decreases the filtration time (in %) from the normally calculated time.
• Turbo (default +30%): Increases the filtration time (in %) of the normally calculated time.
5.1.7.3
pH installation
Modification of the injection parameters of the pH regulator.
Options:
• Injection time (default 15 s): Duration of each sequence of injection of the corrector carried
out every 15 minutes by the pH pump.
• Min Temperature (default 16°C): Temperature below which the pH corrector is not injected.
• Max day volume (default 0.5  l): Maximum permissible pH regulator injection volume (for a
pump with a flow rate of 1 l/h) in order to protect against possible overdose.
5.1.7.4
Disinfectant installation
Modification of the disinfectant injection parameters other than an electrolyser (injection of
bromine, active oxygen).
Options:
• Injection time (default 15 s): Time of each disinfectant injection sequence.
• Min Temperature (default 14°C): Temperature below which the disinfectant is not injected or
the electrolyser is stopped in order to limit the wear of the plates.
• Max day volume (default 0.5 l): Maximum permissible volume of disinfectant injection (for a
pump with a flow rate of 1 l/h) to protect against possible overdose.
5.1.7.5
Aux1 installation
Choose Aux1 settings.
Options:
• Robot mode (default No): Select Yes to assign the AUX1 output to a robot cleaner.
• Backwash mode (default Yes): Select Yes to control a pneumatic backwash push pull valve.
Ref. SB-CU-IMP-062EBLA / A - 11.05.2023
Installation and Operation Guide Version E-Box MAESTRO Lite - Programming
55 / 90

Advertisement

Table of Contents
loading

Table of Contents