Installation and Operation Guide Version E-Box MAESTRO Lite - Installation
1. High voltage connection (230V)
1
Terminal block 1: High voltage
connection (230V) [
230V minimum power compatible cables
5 mm
Minimum dry contact compatible cables
5 mm
4.8.2.1
Terminal block 1: High voltage connection (230V)
Positions and markings of the connection terminals:
N-L1
E-Box Main Power Supply (230V)
1-2
Uncontrolled connection of the electrolyser power supply (230 V 6A)
34 / 90
2. Low voltage connection (12/24V)
Page 34]
= R02V (3x1.5mm² min)
= R02V (3x1.5mm² min)
2
Terminal block 2: Low voltage
connection (12-24 V) [
Ref. SB-CU-IMP-062EBLA / A - 11.05.2023