Connection Of The Pool Automatic Shutter Power Supply (If Equipped); Probe Unit And Control Centre; Wall Mounting - Pentair E-Box MAESTRO Lite Installation And Operation Manual

Table of Contents

Advertisement

Control of the electrolyser through the dry contacts 15 and 16.
4.8.6

Connection of the pool automatic shutter power supply (if equipped)

The connection of the supply phase, the neutral and the earth must be made through the
connection terminal block according to terminals 7 and 8 (for the earth connection: proceed to the
connection on the dedicated terminal block).
The electric consumption of the automatic shutter of the swimming pool must not exceed 16 A in
single phase.
This connection allows only the electrical supply of the swimming pool shutter and not its opening
or closing control.
4.9

Probe Unit and Control Centre

4.9.1

Wall mounting

Caution - material
The device must not be installed outdoors, preferring instead a technical room
inaccessible to children.
• Ensure that the bracket on which the appliance is installed can support a load of
5 kg.
• Use dowels suitable for the bracket on which the enclosure is to be installed.
Info
The installation procedure below is valid for Probe Unit and Control Centre devices.
1. Mark the three holes to be drilled in the wall according to the dimension (5) indicated behind
the device (2).
2. Drill through the wall at the previously marked locations.
3. Insert one dowel into each hole.
Ref. SB-CU-IMP-062EBLA / A - 11.05.2023
Installation and Operation Guide Version E-Box MAESTRO Lite - Installation
37 / 90

Advertisement

Table of Contents
loading

Table of Contents