Package Contents - Pentair E-Box MAESTRO Lite Installation And Operation Manual

Table of Contents

Advertisement

Installation and Operation Guide Version E-Box MAESTRO Lite - Installation
4.2

Package contents

• 1 E-Box
• 5 Cables for the connections of the MAESTRO in the E-Box
• Cable glands set for installation of cables in the E-Box
• 1 Control Centre MAESTRO
• 1 Probe Unit MAESTRO
• 4 Probes (pH, RedOx, conductivity and temperature)
• 2 Chemical solutions for pH probe calibration (pH4 and pH7 solutions)
• 1 Analysis chamber with associated pipes and fasteners
• 1 Inner Display
• 1 Radio Relay
• 1 pack of 8 AA size batteries
• 1 Internet Relay
• 1 power cable for Internet Relay with integrated transformer
• 1 RJ45 cable for Internet Relay
• 1 Peristaltic pump 1.5 l/h for injection of liquid pH correction solution
Depending on the options chosen:
• 1 Peristaltic pump 1.5  l/h for the injection of liquid chlorine or liquid peroxide, special
swimming pool
24 / 90
Ref. SB-CU-IMP-062EBLA / A - 11.05.2023

Advertisement

Table of Contents
loading

Table of Contents