Pentair E-Box MAESTRO Lite Installation And Operation Manual page 46

Table of Contents

Advertisement

Installation and Operation Guide Version E-Box MAESTRO Lite - Installation
Connection of secondary lighting (garden, atmosphere) with a power of less than 1600 W.
Info
The main pool lighting must be connected directly to the E-Box.
1. Connect the lighting according to the diagram below.
2. The operation of this lighting control will be the same as that of the swimming pool lighting
through the terminal blocks 17-18.
Connection of an electric heater
1. Connect the heater according to the choice of the diagram below (greater than or less than
20A).
< 20A through terminal blocks 3-4
46 / 90
Ref. SB-CU-IMP-062EBLA / A - 11.05.2023

Advertisement

Table of Contents
loading

Table of Contents