E-Box; Wall Mounting - Pentair E-Box MAESTRO Lite Installation And Operation Manual

Table of Contents

Advertisement

4.8

E-Box

4.8.1

Wall mounting

Caution - material
The device must not be installed outdoors, preferring instead a technical room
inaccessible to children.
• Ensure that the bracket on which the appliance is installed can support a load of
10 kg.
• Use dowels suitable for the bracket on which the enclosure is to be installed.
ü The casing should rests on a workbench.
1. Unscrew the twelve screws (2).
2. Remove the two covers (3).
3. Use a drill to make four holes (1).
1
Tip
It is advisable to drill the holes (1) of the four corners of the E-Box (6).
Otherwise, take into account the centre of gravity of the E-Box in order to determine the
position of the holes.
4. Mark the four holes (4) to be drilled in the wall.
5. Drill through the wall at the previously marked locations.
6. Insert one dowel into each hole.
7. Secure the E-Box (6) with four screws (5).
Ref. SB-CU-IMP-062EBLA / A - 11.05.2023
Installation and Operation Guide Version E-Box MAESTRO Lite - Installation
2
3
31 / 90

Advertisement

Table of Contents
loading

Table of Contents