Installation and Operation Guide Version E-Box MAESTRO Lite - Installation
4.9.4.2
Control Centre connections
Connections to be made to the Control Centre box, through the fast cables (provided).
Info
No internal connections in the Control Centre cabinet
4.9.4.3
Connections of the probes (pH + RedOx + conductivity + temperature)
1. Unscrew the cable gland completely: be careful not to drop the black flexible seal.
2. Pass the 4 cables through the nut and the cable gland.
3. Connect each terminal according to the indication under each terminal block.
4. Screw with a 2.5 mm slot screwdriver to 0.5-0.6 N.m.
5. Tighten the cable gland tightly by hand.
44 / 90
Connector cable for control link with the E-Box
Power cable from the Maestro connection with the E-Box
220V
Connector cable 1 connected
with the E-Box
Link and information cable with the Probe Unit
Information contact cable
Connection with the E-Box
Ref. SB-CU-IMP-062EBLA / A - 11.05.2023