Xylem FLYGT Pareo DCM 711 Installation, Operation And Maintenance Manual page 24

Control module
Table of Contents

Advertisement

4 Installation
3. Open the control box.
4. Install the power cable and the pump cable through the cable entries.
For more information, see
5. Connect the power supply leads to the power terminals.
For more information, see
6. Connect the leads of the pump motor cable to the pump terminals.
For more information, see
7. Check that all seals are correctly installed.
20
GC*
PE
L3
L2
L1
L1 L2 L3
T1
T1 T2
Parts
on page 9.
Terminals
on page 46.
PE
GC*
Terminals
on page 46.
T2
L3
L2
L1
GC* ≥ 24 A
GC* ≤ 24 A
L2
PE
L1
L3
PE
GC*
DCM 711 Installation, Operation, and Maintenance Manual

Advertisement

Table of Contents
loading

Table of Contents