8. Check that the cables are not pinched.
9. Close the control box.
4.3.3 Optional parts
4.3.3.1 Install the float switch
• The extra cable entry of the control box must be open before starting the installation.
• For more information about the parts, see
• Make sure to maintain the IP rating of the control box.
1. Open the control box.
2. Install a cable gland in the extra cable entry.
Make sure to maintain the IP rating of the control box.
3. Install the cable through the cable gland.
LS+
4. Connect the float switch leads to the FS terminals.
For more information about the terminals, see
4.4 Pareo DCM 711 control module
4.4.1 Installation requirements
• For North America and other applicable markets
• IEC requirements
4.4.2 Mechanical installation
The control module is installed on the cabinet door.
1. Drill four 5 mm (0.2 in) holes.
The image shows the drilling pattern.
DCM 711 Installation, Operation, and Maintenance Manual
FS-
FS+
– The modules must be installed in an industrial control cabinet.
– The modules must be installed in a safety enclosure with minimum IP44 rating.
Parts
on page 9.
LS-
Terminals
4 Installation
on page 46.
21