Download Print this page

OLT SR812-FJ-Ply Assembly Manual page 46

8x12 santa rosa shed fj bevel model with plywood roof

Advertisement

81.
Toe-nail Short Post to Deck
with 3 - 2 1/2" Screws. Drill pilot
holes to avoid splitting posts.
Note: Ensure the screws are low
enough on the post to be covered by
Post Base Trim in Step 97.
Hardware (Steps 81)
S1 - 2 1/2" Screws
x 3 total
Window
frame.
82.
To reduce possible water from penetrating
into the window cavity, caulk gap on both sides
of window opening prior to installing Window
Insert. Position insert in cavity and screw with
6 - 1 1/4" Screws. On sides, make sure to
screw insert into the thick butt of the siding only.
Toll Free 1-888-658-1658
Caulk
gap.
Screw insert into
bottom (thick)
part of siding.
Parts (Step 82)
Window Insert x 3
Hardware (Step 82)
S2 - 1 1/4" Screws
www.outdoorlivingtoday.com
Page 46
x 36 total
83.
caulk
Caulk
between the Insert's outside
gap.
flange and the siding. Also put
a bead of caulking horizontally
at top of window where the
flange and siding meet.
additional caulking will also will
reduce the chances of moisture
entering into your shed.
sales@outdoorlivingtoday.com
Once Insert is attached,
the
"triangular
gap"
This

Advertisement

loading