Download Print this page

OLT SR812-FJ-Ply Assembly Manual page 20

8x12 santa rosa shed fj bevel model with plywood roof

Advertisement

Confirm 32" Wide Door
Opening at Top and Bottom.
24.
When all walls are attached together, check alignment with the floor. Bottom
wall plates should sit flush with outside of floor frame. When positioned correctly,
fasten bottom wall plates to floor using 4 - 2 1/2" screws per wall panel.
25.
Position Rear Top Plates on top of wall studs
so they are flush on the inside with 2x3 wall stud.
The Top Plate is comprised of 3 pieces (2 outside
pieces with an angle cut on one end and a center
piece that is straight cut).
down into top wall plate with 2 - 2" screws per
plate.
Parts (Steps 25)
Rear Top Plates
(3/4" x 2 1/2" x 32") x 3
Hardware (Steps 25)
S3 - 2" Screws
Toll Free 1-888-658-1658
Wall Plate
Angle
screws into perimeter
Floor Joists.
Attach by screwing
x 6 total
www.outdoorlivingtoday.com
32" wide
Page 20
Optional - Caulking seams will
help prevent moisture from
entering your shed.
Caulking not included in kit.
Hardware (Steps 24)
S1 - 2 1/2" Screws
x 32 total
Top Plates should be flush
with inside of wall framing.
sales@outdoorlivingtoday.com
Angle cut
on ends.

Advertisement

loading