Download Print this page

OLT SR812-FJ-Ply Assembly Manual page 42

8x12 santa rosa shed fj bevel model with plywood roof

Advertisement

71.
Attach two Roof Nailing Strips to the underside of
the roof plywood on rear of shed. Align strips flush with
plywood ends. Fasten with 4 - 1 1/4" Screws per piece.
72.
Attach remaining two Roof Nailing Strips to the underside of the
roof plywood on front of shed. These strips will be pushed tight against
the rafters unlike the Rear Nailing Strips. Fasten with 4 - 1 1/4" Screws
per piece.
73.
Position Front Post Detail Covers onto bottom corner of
rafters, tight underneath Facia Nailing Strips. Covers should be
approximately flush with the bottom of the Porch Roof, the inside
of the 4x4 Porch Post, and the Rafter ends. Attach with 4 - 1 1/2"
Finishing Nails per piece.
Toll Free 1-888-658-1658
(3/4" x 2 1/2" x 53") x 2
www.outdoorlivingtoday.com
Page 42
Parts (Steps 71)
Roof Nailing Strips
Parts (Steps 72)
Roof Nailing Strips
(3/4" x 2 1/2" x 53") x 2
Hardware (Steps 72)
S2 - 1 1/4" Screws
Flush
Parts (Steps 73)
Front Post Detail Covers
(1/2" x 5 1/2" x 23 1/4") x 2
Hardware (Steps 73)
N1 - 1 1/2" Finishing Nails
x 8 total
sales@outdoorlivingtoday.com
Hardware (Steps 71)
S2 - 1 1/4" Screws
x 8 total
x 8 total

Advertisement

loading