Download Print this page

OLT SR812-FJ-Ply Assembly Manual page 26

8x12 santa rosa shed fj bevel model with plywood roof

Advertisement

36.
Locate 9 - Rafters, 2 - Soffits & complet-
ed Ridge Board. Lay out on level ground as
shown to the right. Double up Rafters as illus-
trated. Screw doubled up Rafters together with
3 - 2 1/2" screws per piece. Note: completed
Rafer section will be flipped over in Step 38.
Parts (Steps 36 - 38)
(1 1/2" x 3 1/2" x 56 1/2") x 18
(1/2" x 4 1/2" x 68 1/4") x 4
Hardware (Steps 36 - 38)
S1 - 2 1/2" Screws
S2 - 1 1/4" Screws
S3 - 2" Screws
37.
Attach completed Ridge Board to ends of both outside rafters
with 2 - 2" screws per end. Measure and position interior Rafters as
illustrated below. When positioned correctly, attach Ridge Board to
remaining rafters with 2 - 2" screws per Rafter end.
20 1/2"
38.
Attach end of a Soffit Board flush to ends of outside Rafters with 2 - 1 1/4" screws per rafter end. Drill
pilot hole in Soffit ends to prevent splitting. Complete both outside Rafter & Soffit connections first. Measure
and position interior Rafters as illustrated above. When positioned correctly, attach Soffits to remaining
Rafters with 2 - 1 1/4" screws per Rafter. Flip completed Rafter section over. Complete 2nd Rafter section
now as per Steps 35 - 38 with the following exception. When attaching Ridge Board to Rafter ends, make
sure Ridge Board Connector is positioned offset to first Rafter Section. See Step 45 for illustration.
Toll Free 1-888-658-1658
Rafters
Soffits
x 16 total
x 16 total
x 16 total
Connector
45 1/2"
Plate to
inside
68 1/4"
Important:
Pilot Hole Soffit to
prevent splitting!
www.outdoorlivingtoday.com
2 1/2" Screws
into Doubled
up Rafters
Important:
Pilot Hole Ridge
Board to prevent
splitting!
136 1/2"
20 1/2"
45 1/2"
Carefully flip
Rafter Sections
over when
complete
Page 26
Ridge Board
20 1/2"
45 1/2"
sales@outdoorlivingtoday.com
Soffits

Advertisement

loading