Download Print this page

OLT SR812-FJ-Ply Assembly Manual page 14

8x12 santa rosa shed fj bevel model with plywood roof

Advertisement

Narrow Wall
18.
To complete walls, attach the Narrow Porch Wall to
front wall panel. Note: the narrow wall is only 73" high.
Attach wall stud to adjoining wall with 3 - 2 1/2" screws.
1" overhang
19.
Attach Door Jamb to right side wall stud. When positioned correctly, the Jamb
will overhang the right side wall panel framing by 1/2". When in correct position, secure
to wall stud with 4 - 2 1/2" screws. Align Door Header on top of Narrow wall framing
and on top of Door Jamb. See picture below. Secure with 4 - 2 1/2" screws.
Door Header flush
with inside framing
Toll Free 1-888-658-1658
Door Jamb
Hardware (Steps 19)
S1 - 2 1/2" Screws
x 8 total
www.outdoorlivingtoday.com
1/2" recessed from
front of Door Jamb
Page 14
Parts (Steps 18)
Narrow Porch Wall x 1
Door Header
positioned with
Dado to front
and top.
Parts (Steps 19)
Door Jamb
(1 1/2" x 3 1/2" x 73")
Door Header
(2" x 3" x 45 1/2")
Pre­Drill!
sales@outdoorlivingtoday.com
x 1
x 1

Advertisement

loading