Download Print this page

OLT SR812-FJ-Ply Assembly Manual page 44

8x12 santa rosa shed fj bevel model with plywood roof

Advertisement

Side Facia
76.
Position Front Facia - angle cut ends tight underneath roof shingles
and tight against Nailing Strips. Temporarily position Side Facia for a dry run
to help you correctly position Front Facia before attaching.
Attach Front Facia to Roof Plywood with 8 - 1 1/2" Finishing Nails per
piece. A small gap may appear where Front Facias come together at peak.
This gap will be covered in Step 79.
77
Attach Side Facia to rafter ends. There are 2 Facia pieces per side.
A small gap may appear between Facias, which will be covered in Step
79. Secure with 8 - 1 1/2" Finishing Nails per piece.
Toll Free 1-888-658-1658
Rear Facia
www.outdoorlivingtoday.com
Small gap
may appear
Small gap
between
side facia
Page 44
Hardware (Steps 76)
N1 - 1 1/2" Finishing Nails
x 16 total
Hardware (Steps 77)
N1 - 1 1/2" Finishing Nails
x 32 total
sales@outdoorlivingtoday.com

Advertisement

loading