Quantum P2000 Series User Manual page 111

Automated tape library
Table of Contents

Advertisement

Remove the ramp sections from the pallet and slide them
b
into the center section.
Insert the foam block around the bottom of the library and
c
the pallet.
Insert and attach the stop blocks underneath the library on
d
the right side.
Attach the wooden bar on the right side of the library.
e
Remove the wooden bar on the left side of the library.
f
Repeat steps d and e for the left side of the library.
g
Place the accessory kits into the cutouts on the back crate panel.
4
Place the foam cap over the library.
5
Wrap the cardboard crate around the library and fasten it using
6
the plastic restraining clips.
Place the top onto the crate.
7
Secure the crate with two steel restraining bands.
8
ATL P2000 Series Automated Tape Library User's Guide
Appendix B Relocating the Library
Crating the Library
91

Advertisement

Table of Contents
loading

Table of Contents