Eaton 91PS/93PS UPS 8–40 kW
3.
Open the UPS package. The
roof of the package is used as a
ramp for moving the UPS off the
pallet.
4.
Place the ramp on the floor and
attach it to the pallet with nails
or screws so that it can be
safely used for wheeling the
UPS off the pallet.
5.
If the leveling feet are not fully
retracted, turn them until they
are retracted.
©