Installing Parallel Control Wiring - Eaton 91PS UPS 8-40 kW User And Installation Manual

Table of Contents

Advertisement

Eaton 91PS/93PS UPS 8–40 kW
ECAN provides means for communication between the UPS's in a parallel
system. When this network fails, the system continues to share load and protect
the load.
Bypass Pull-Chain
Bypass Pull-Chain is an open collector signal that goes low when the bypass
static switch of any UPS is online. When External CAN (ECAN) is down, the
pull-chain is low and the UPS is online, the UPS locks to and transfers to the
bypass mode. Service can manually short this signal in some rare failure modes
to force a system transfer to bypass.
Signal Inputs Actions
Each UPS has a maximum of 7 signal inputs, 5 native and one in each MiniSlot
when using a suitable connectivity device. These inputs can be configured with
action items. The following action items affect all the UPSs in the system. When
an action item is active on a UPS and the MOB is closed, the action item is
transmitted on the ECAN to all the UPSs.
Wiring the EPO switch in parallel
It is recommended to use separate EPO circuits for each parallel unit.
5.6.3
1.
During the installation, follow all the safety instructions given in this
document.
2.
Terminal blocks TB6, TB7 and TB8 are for external parallel control signals
(see Figure
3.
The Phoenix Contact FRONT-MSTB 2,5/2-STF-5,08 and 2,6/4-SFT-5,08
plug components are used for cable wiring termination.
©
Eaton Corporation plc 2018. All rights reserved.

Installing parallel control wiring

26
and Figure
27
).
Revision: 005
Document ID: P-164000493
User's and installation guide
67 (117)

Advertisement