Fastlane
Pro Swim Unit Installation
®
6.4 Reinstall the vertical water-conditioning grill (Fig. 6.3).
Fig. 6.3
6.5 The top lid will be installed AFTER the Fastlane Pro is mounted to the pool wall/pool deck using the
Fig. 6.4
29
Vertical Grill
provided 3/4" (19mm) screws (Fig. 6.4).
Top Lid
3/4" (19mm) Phillips
Truss Head Screw x6
Need help?
Do you have a question about the FASTLANE PRO and is the answer not in the manual?