INSTALLATION
DIP Switch of B3
ON WE
1 2 3 4
DIP Switch of M4856-P
ON WE
1 2 3 4
DIP Switch of M4856-P
ON WE
1 2 3 4
Figure 2.39 Set DIP Switch
Step 22 Set DIP Switch
NOTE: If there is only one M4856-P to be connected, switch off the DIP2 in
SMILE-B3 and switch on the DIP2 in M4856-P.
If there are more than two batteries to be connected, please refer to DIP switch
configuration table as below:
Battery
DIP 1
DIP 2
Position.
Non-bottom
battery
OFF
OFF
(incl. B3-bat)
battery
Bottom
OFF
ON
23
DIP 3
DIP 4
DIP Switch
O
OFF
N
W
E
OFF
1
2
3
4
O
OFF
N
W
E
OFF
1
2
3
24
Bottom battery is the battery farthest from the inverter.
Figure 2.40 Turn on the Circuit Breaker
Step 23 Turn on the circuit breaker. The status of the figure 2.40 above is connected
viewed from the front.
Figure 2.41 Install the Maintenance Cover
Step 24 Install the maintenance cove with the torque being 2.8 N.m±10%.
Step 25 Install the B3 upper cover and decoration of M4856-P, insert the white rubber
plugs into the fixing hole of the B3 upper cover, and the installation is complete.