INSTALLATION
Step 1 Take out the M4856-P(indoor) from the carton; confirm whether the
accessories are complete,as shown in Figure 2.18
Figure 2.19 Remove the Decoration of M4856-P
Step 2 Pull down the buckles on the top and bottom of the battery and take out the
decoration, as shown in Figure 2.19
Figure 2.20 Remove the Wall Bracket of M4856-P
Step 3 Use T20 screwdriver to remove the 4 screws fixing the box and the wall
bracket, as shown in Figure 2.20
Figure 2.21 Install M4856-P Expansion Bracket
Step 4 Use SW7 sleeve or other tools for the M4 flange and M4 flange nuts to
connect the M4856-P wall bracket to the expansion bracket, as shown in Figure 2.21.
NOTE:
The connection points between the wall bracket and the expansion bracket must
be the two holes above (the holes for B3 expansion).
15
16
Step 5 After installing the expansion bracket, match the wall bracket with SMILE-B3, and
use M5*10 screws to lock and fix, then locate and trace.
NOTE:
If the positioner is not removed, SMILE-B3 can not be removed separately in the
future.
Step 6 Drill holes at the position using a percussion drill (M12 drill, depth of holes:
70mm). After drilling, put 4 expansion bolts into the hole and take out the expansion
screws as shown in Figure 2.23
Figure 2.22 Install the Positioning Bracket
Figure 2.23 Holes for Fixing Bracket