Uncrating And Inspection - ELECTRO FREEZE GENESIS Series Operator's Manual

Soft serve freezer
Table of Contents

Advertisement

ELECTRO FREEZE Soft Serve Model GEN-5400
2.1

Uncrating and Inspection

When the unit is received and while
the carrier is still present, inspect the
shipping carton for any damage that
may have occurred in transit. If the
SHOCKWATCH
or the carton is broken, torn, or punctured,
Figure 2-1 Machine Bolted to Shipping Base
Figure 2-2 Installing Mounting Legs or Casters
2
CAUTION
Be sure to properly
support the machine
when removing bolts and
installing legs or casters.
label indicates red and/
®
note the damage on the carrier's freight
bill and notify the carrier's local agent
immediately.
1. Remove the carton from the
pallet, and move the machine as close as
possible to the permanent location.
2. Remove the shipping bolts on
the bottom of the freezer (figure 2-1) and
install either the legs or casters (figure
2-2).
NOTE: Screw casters
or legs all the way in
coupling, then adjust
out to level with 1/4
inch slope to front.
184297

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gen-5400

Table of Contents