Uncrating And Inspection - ELECTRO FREEZE SLX400C Operator's Manual

Genesis series, soft serve freezer
Table of Contents

Advertisement

ELECTRO FREEZE Soft Serve Models SLX400C

2.1 Uncrating and Inspection

When the unit is received and while
the carrier is still present, inspect the
shipping carton for any damage that
may have occurred in transit. If the
SHOCKWATCH
or the carton is broken, torn, or punctured,
Figure 2-1 Machine bolted to Shipping Base
Figure 2-2 Installing Mounting Casters
2
CAUTION
Be sure to properly support
the machine when removing
bolts and installing legs or
casters.
label indicates red and/
®
note the damage on the carrier's freight
bill and notify the carrier's local agent
immediately.
1. Remove the carton from the
pallet, and move the machine as close as
possible to the permanent location.
2. Remove the shipping bolts on
the bottom of the freezer (figure 2-1) and
install either the legs or casters (figure
2-2).
NOTE: Screw legs all
the way in coupling,
then adjust to level
side to side with a 1/4"
slope to the front.
184582-01

Advertisement

Table of Contents
loading

Table of Contents