Uncrating And Inspection - ELECTRO FREEZE 876 Operator's Manual

Cocktail, slush and batch freezers
Table of Contents

Advertisement

ELECTRO FREEZE
2.1

Uncrating and Inspection

When the unit is received and while
the carrier is still present, inspect the
shipping carton for any damage that
may have occurred in transit. If the
SHOCKWATCH® label indicates red and/
or the carton is broken, torn, or punctured,
Figure 2-1 Machine Bolted to Shipping Base
FRONT
Figure 2-2 Installing Mounting Legs or Casters
2
Models 876, 876B, 876C, 876RH, 876BRH, 876CRH & 875 Batch
CAUTION
Be sure to properly support
the machine when removing
bolts and installing legs or
casters.
note the damage on the carrier's freight
bill and notify the carrier's local agent
immediately.
1. Remove the carton from the
pallet, and move the machine as close as
possible to the permanent location.
2. Remove the shipping bolts on
the bottom of the freezer (figure 2-1) and
install either the legs or casters (figure
2-2).
BACK
NOTE: Screw casters
or legs all the way in
coupling, then adjust
out to level with 1/4
inch slope to front.
184633

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

876c876b876crh876rh876brh

Table of Contents