Allied Telesis GS910/XST Series Installation And User Manual page 53

10 gigabit ethernet unmanaged switches
Table of Contents

Advertisement

13. Place the two brackets back on the top of the switch and drive screws
through the holes to attach the brackets on the wall. See Figure 29.
x
Figure 29. Securing the Top Brackets to the Wall
14. Make sure that the brackets are installed securely.
15. Proceed to "Cabling Twisted Pair Ports" on page 42.
Chapter 3: Wall Installation Using the BRKT-J22 Kit
53

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs910/10xstGs910/18xstGs910/26xst

Table of Contents