Allied Telesis GS910/XST Series Installation And User Manual page 51

10 gigabit ethernet unmanaged switches
Table of Contents

Advertisement

Chapter 3: Wall Installation Using the BRKT-J22 Kit
7. Make sure that the two brackets are installed securely.
8. Slide the switch into the brackets on the wall as shown in Figure 27.
x
Figure 27. Placing the Switch into the Brackets
51

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs910/10xstGs910/18xstGs910/26xst

Table of Contents